plan-gate stage (order 115) — Tech plan gate between Planning and Execution. Plannotator visual review of spec-tech.md. Runs only in Product Spec + Interface + Tech Review and Product Spec + Interface + Tech Review + Code Diff review modes.
diff-gate stage (order 175) — Code diff review gate between Verification and Audit. Plannotator review command on the working tree diff. Runs only in Product Spec + Interface + Tech Review + Code Diff review mode. Verification must pass before the diff gate runs.
New review mode: "Product Spec + Interface + Tech Review + Code Diff" — The most advanced mode, adding diff-gate on top of all existing gates. Maximum human oversight with visual code review.
Changed
Review mode rename for clarity and consistency — all mode names are now explicit and additive: